Leatherhead's town centre curls around a bend in the River Mole, with around 11,300 residents in the town itself and a wider built-up area running into Fetcham and Ashtead. Speedy Concrete Pumping reaches Leatherhead from Sutton via the A24, arriving ready to work on everything from riverside plots to the steeper ground below the North Downs.
Mole Valley District Council's Local Plan has directed the largest share of the district's new housing to Leatherhead itself, and the long-running Transform Leatherhead scheme continues to reshape the town centre around the riverside. Speedy supplies Concrete Line Pumps, Concrete Boom Pumps and coordinated ready mix concrete for projects throughout the town and the wider Mole Valley area.


Ground line Concrete Pump Hire in Leatherhead
Leatherhead's High Street conservation area and the older properties around Church Street often rule out a mixer truck getting anywhere near the pour. Speedy's Concrete Line Pumps install steel pipeline and flexible hosing through gateways, side returns and rear gardens, reaching extensions, basement rooms and garden slabs without disturbing neighbouring plots. Same-day and next-day hire is often available, and no trade account is required.
Full Range of Concrete Pumping Services for Leatherhead
Boom Concrete Pump Hire
Where a pour needs reach rather than a gap to squeeze through, Speedy's Concrete Boom Pumps place concrete over garden walls, protected trees and steeply sloping plots in one continuous run. They suit the larger builds coming forward under Transform Leatherhead and the district's Local Plan allocations, where foundations on the valley's sloping ground need careful, high-volume placement. The team assesses gradient and access before agreeing the right boom length for the site.


Ready Mix Concrete Supply
Speedy arranges ready mix concrete through trusted partner suppliers, timed to land on site alongside the pump. That removes the job of coordinating two separate deliveries and two separate access windows, which matters most on Leatherhead's narrower town-centre streets. From a single outbuilding base in Fetcham to a larger foundation pour near the river, the team plans the schedule so everything turns up together.
Why Choose Speedy Concrete Pumping?
24/7 Availability, 365 Days a Year
Speedy operates around the clock, every day of the year. Mole Valley District Council permits standard construction hours on weekdays and Saturday mornings, and commercial projects with extended permits can rely on Speedy for early starts, evening pours or weekend work.
NPORS Accredited Operators
Every Speedy operative holds NPORS accreditation (National Plant Operators Registration Scheme), the recognised standard for plant competence. On sloping sites near the River Mole, where ground conditions and flood risk both need weighing up before a pump goes anywhere near the bank, that experience counts.
Open to Everyone
Homeowners planning an extension or garden room in Leatherhead can book directly, the same as a contractor working on a Transform Leatherhead scheme. Speedy talks through what is needed, recommends the right pump and arranges the concrete if required.
Family-Run, Ten Years In
Speedy is a family-run business with over ten years of concrete pumping experience across Surrey and the South East, offering direct contact with people who understand the work rather than a call centre.



























